The new section, intended primarily for goods transport, is supplied within the 2AC-25-kV-50-Hz system. Covering a length of approximately 2,000 km, it is one of the world’s longest freight transport lines. The CP-204 section (EDFC-2) is approximately 388 km long. Even with the exacerbated conditions associated with the total failure of a substation, the intended train haulage programme should be able to be completed without significant extensions to travel time, whereby the length of the haulage sections is doubled to approximately 60 km.