2020 – 2022 , Regierungspräsidium Tübingen

In conjunction with the B28 construction projects, LCSS (level crossing safety system) II (51530 km) and III (51.893 km) need to be removed and LCSS I (50.139 km) needs to be technically adjusted on line 4600 between Tübingen – Horb.

  • Adjustment of control and safety technology to establish a railway underpass
  • All interior and exterior systems on both LCSS must be removed. Adjustments need to be made to level crossing system I (multiple level crossing). Replacement of old technology
  • Drafting of internal corporate approval
  • Other adjustments also need to be made in the Tübingen SpDrS60 signal box.