{"id":3821,"date":"2021-09-01T15:37:58","date_gmt":"2021-09-01T13:37:58","guid":{"rendered":"https:\/\/signon-group.com\/referenzen\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge"},"modified":"2021-10-25T13:56:07","modified_gmt":"2021-10-25T11:56:07","slug":"planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge","status":"publish","type":"reference","link":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge","title":{"rendered":"Planning of technical rail equipment at the Port of Hamburg \u2013 New Kattwyk railway bridge"},"content":{"rendered":"\n<p>Line 1253 on the Hamburger Hafenbahn port railway between Hohe Schaar station and Hausbruch station crosses the S\u00fcderelbe with a combined road and railway lift bridge. Road and rail traffic make use of the same traffic area.<\/p>\n\n\n\n<p>In order to reduce the pressure on the existing Kattwyk Bridge, separate rail and road traffic and increase the capacity of both modes of transport, the intention is for a new double-track lift bridge for rail traffic to be built to the north of the existing lift bridge. The existing Kattwyk Bridge is then provided exclusively for road traffic. <\/p>\n\n\n\n<p> The eastern approach to the New Kattwyk rail bridge will be expanded to include two tracks. Both bridge tracks will then merge again to the west of the S\u00fcderelbe. From there, the line then runs along a single track to Hausbruch station. Due to the work on relocating and expanding the eastern siding, the track systems on the port railway and the sidings and train formation tracks owned by the company Oiltanking located to the north of the line must also be relocated.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Line 1253 on the Hamburger Hafenbahn port railway between Hohe Schaar station and Hausbruch station crosses the S\u00fcderelbe with a combined road and railway lift bridge. Road and rail traffic make use of the same traffic area. In order to reduce the pressure on the existing Kattwyk Bridge, separate rail and road traffic and increase [&hellip;]<\/p>\n","protected":false},"featured_media":12109,"template":"","class_list":["post-3821","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Planning of railroad equipment Port of Hamburg - New railroad bridge Kattwyk - SIGNON<\/title>\n<meta name=\"description\" content=\"Design and construction planning of a new double-track lift bridge to relieve the Kattwyk Bridge\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Planning of railroad equipment Port of Hamburg - New railroad bridge Kattwyk - SIGNON\" \/>\n<meta property=\"og:description\" content=\"Design and construction planning of a new double-track lift bridge to relieve the Kattwyk Bridge\" \/>\n<meta property=\"og:url\" content=\"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge\" \/>\n<meta property=\"og:site_name\" content=\"SIGNON\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-25T11:56:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/signon-group.com\/wp-content\/uploads\/2020\/12\/AUSBAU-DER-SCHONBUCHBAHN-Planungsleistungen-Lph-1-bis-4-entsprechend-HOAI_shutterstock_1480388747-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/signon-group.com\\\/en\\\/references\\\/details\\\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge\",\"url\":\"https:\\\/\\\/signon-group.com\\\/en\\\/references\\\/details\\\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge\",\"name\":\"Planning of railroad equipment Port of Hamburg - New railroad bridge Kattwyk - SIGNON\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/signon-group.com\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/signon-group.com\\\/en\\\/references\\\/details\\\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/signon-group.com\\\/en\\\/references\\\/details\\\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/signon-group.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/1920x700_Hafen-Hamburg-OCo-Neue-Bahnbru\u2560ecke-Kattwyk.png\",\"datePublished\":\"2021-09-01T13:37:58+00:00\",\"dateModified\":\"2021-10-25T11:56:07+00:00\",\"description\":\"Design and construction planning of a new double-track lift bridge to relieve the Kattwyk Bridge\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/signon-group.com\\\/en\\\/references\\\/details\\\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/signon-group.com\\\/en\\\/references\\\/details\\\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge#primaryimage\",\"url\":\"https:\\\/\\\/signon-group.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/1920x700_Hafen-Hamburg-OCo-Neue-Bahnbru\u2560ecke-Kattwyk.png\",\"contentUrl\":\"https:\\\/\\\/signon-group.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/1920x700_Hafen-Hamburg-OCo-Neue-Bahnbru\u2560ecke-Kattwyk.png\",\"width\":1920,\"height\":700},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/signon-group.com\\\/en#website\",\"url\":\"https:\\\/\\\/signon-group.com\\\/en\",\"name\":\"SIGNON\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/signon-group.com\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Planning of railroad equipment Port of Hamburg - New railroad bridge Kattwyk - SIGNON","description":"Design and construction planning of a new double-track lift bridge to relieve the Kattwyk Bridge","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge","og_locale":"en_US","og_type":"article","og_title":"Planning of railroad equipment Port of Hamburg - New railroad bridge Kattwyk - SIGNON","og_description":"Design and construction planning of a new double-track lift bridge to relieve the Kattwyk Bridge","og_url":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge","og_site_name":"SIGNON","article_modified_time":"2021-10-25T11:56:07+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/signon-group.com\/wp-content\/uploads\/2020\/12\/AUSBAU-DER-SCHONBUCHBAHN-Planungsleistungen-Lph-1-bis-4-entsprechend-HOAI_shutterstock_1480388747-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge","url":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge","name":"Planning of railroad equipment Port of Hamburg - New railroad bridge Kattwyk - SIGNON","isPartOf":{"@id":"https:\/\/signon-group.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge#primaryimage"},"image":{"@id":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge#primaryimage"},"thumbnailUrl":"https:\/\/signon-group.com\/wp-content\/uploads\/2022\/07\/1920x700_Hafen-Hamburg-OCo-Neue-Bahnbru\u2560ecke-Kattwyk.png","datePublished":"2021-09-01T13:37:58+00:00","dateModified":"2021-10-25T11:56:07+00:00","description":"Design and construction planning of a new double-track lift bridge to relieve the Kattwyk Bridge","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/signon-group.com\/en\/references\/details\/planning-of-technical-rail-equipment-at-the-port-of-hamburg-new-kattwyk-railway-bridge#primaryimage","url":"https:\/\/signon-group.com\/wp-content\/uploads\/2022\/07\/1920x700_Hafen-Hamburg-OCo-Neue-Bahnbru\u2560ecke-Kattwyk.png","contentUrl":"https:\/\/signon-group.com\/wp-content\/uploads\/2022\/07\/1920x700_Hafen-Hamburg-OCo-Neue-Bahnbru\u2560ecke-Kattwyk.png","width":1920,"height":700},{"@type":"WebSite","@id":"https:\/\/signon-group.com\/en#website","url":"https:\/\/signon-group.com\/en","name":"SIGNON","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/signon-group.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/reference\/3821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":11,"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/reference\/3821\/revisions"}],"predecessor-version":[{"id":6001,"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/reference\/3821\/revisions\/6001"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/media\/12109"}],"wp:attachment":[{"href":"https:\/\/signon-group.com\/en\/wp-json\/wp\/v2\/media?parent=3821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}